Online edition of India's National Newspaper
Wednesday, Nov 01, 2006
ePaper
Google



Kerala

News: ePaper | Front Page | National | Tamil Nadu | Andhra Pradesh | Karnataka | Kerala | New Delhi | Other States | International | Opinion | Business | Sport | Miscellaneous | Engagements |
Advts:
Classifieds | Jobs | Obituary |

Kerala - Kollam Printer Friendly Page   Send this Article to a Friend

Row over road development

Staff Reporter

May cause inconvenience to Sabarimala pilgrims

KOLLAM: Pilgrims coming from the Tamil Nadu side to Sabarimala through Aryankavu this season may have to endure much road problems as the Punalur Division of the National Highway on Monday decided not to repair the portion of the National Highway 208 passing through the Thenmala and Aryankavu grama panchayats.

The deadlock in ad hoc talks held in this connection between the representatives of the people and the NH authorities at Thenmala resulted in the development.

The talks were led by the presidents of the Thenmala and Aryankavu grama panchayats K. Sasidharan and Mambazhathara Salim. The team from the NH Division Office was led by Assistant Executive Engineer C.R. Santosh Kumar.

The road portion taken up for repair was the 37-km-long Punalur-Kottavasal stretch of the NH. A sum of Rs.45 lakh has been allocated for the purpose. There is also another allocation of Rs.18 lakh specifically for the repair of NH 208 portion passing through the Thenmala and Aryankavu panchayat areas.

The dispute that cropped up during the talks was that a December 2005 allocation of Rs.3 crore for converting the NH 208 portion passing through the two panchayat areas into NH standard road had not been utilised so far.

The construction was to have completed in September 2005. It may be noted that NH 208 was notified only a few years ago and the Kerala portion of the road is yet to be commissioned on NH standards.

The representatives said that there was no use repairing the road. There should be an assurance on constructing the road as per NH standards and that should commence along with the repair works on the other portion.

This the NH authorities were unable to assure and hence the deadlock.

Mr. Santosh Kumar informed the NH higher authorities of the development. The NH Punalur Division would, however, go ahead with repairing the NH portions of the road outside the territory of the two panchayats.

Printer friendly page  
Send this article to Friends by E-Mail



Kerala

News: ePaper | Front Page | National | Tamil Nadu | Andhra Pradesh | Karnataka | Kerala | New Delhi | Other States | International | Opinion | Business | Sport | Miscellaneous | Engagements |
Advts:
Classifieds | Jobs | Obituary | Updates: Breaking News |



News Update


The Hindu Group: Home | About Us | Copyright | Archives | Contacts | Subscription
Group Sites: The Hindu | The Hindu ePaper | Business Line | Business Line ePaper | Sportstar | Frontline | Publications | eBooks | Images | Home |

Copyright © 2006, The Hindu. Republication or redissemination of the contents of this screen are expressly prohibited without the written consent of The Hindu