Online edition of India's National Newspaper
Monday, Nov 13, 2006
ePaper
Google



Kerala

News: ePaper | Front Page | National | Tamil Nadu | Andhra Pradesh | Karnataka | Kerala | New Delhi | Other States | International | Opinion | Business | Sport | Miscellaneous | Engagements |
Advts:
Classifieds | Jobs | Obituary |

Kerala Printer Friendly Page   Send this Article to a Friend

Balan: KSEB not to be divided, only restructured

Staff Reporter

Minister sees need for more hydel projects


  • Says State urgently needs an additional 1,000 MW of power
  • Moots power transmission highway from Koodamkulam

    KOCHI: The Kerala State Electricity Board (KSEB) will be restructured under one umbrella, though the Centre insists that it be split into three units for power generation, transmission and distribution, respectively, Minister for Electricity A.K. Balan said here on Sunday.

    At a meet-the-press programme organised by the Ernakulam Press Club, he said the Board would be retained in the public sector, despite the Centre demanding that it be made a company.

    "The State urgently needs at least 1,000 MW of power, in addition to the existing availability. The aim is to provide quality power to domestic and commercial consumers, without disruption. As of now, 50 per cent of the power is purchased from other States, paying up to Rs. 8 per unit. But consumers here are being charged much less."

    He said the number of consumers would soon increase from the present 82 lakh to 1 crore.

    There was a need for more hydroelectric projects in the State.

    Environmentalists were blindly opposing hydroelectric power projects, such as the one in Athirappilly. Unless work started now, the State would land up in a power crisis, and power cuts would be the order of the day.

    Mr. Balan said industrial units in Ernakulam needed at least 600 MW of power, and mooted a "power transmission highway" from Koodamkulam to Ernakulam, through Edamon, Pathanapuram, Ranni, Kottayam, Kaduthuruthy and Piravom. The Board would have to acquire just 4.8 hectares of land for the purpose, considering that each transmission tower required 4 cents of land.

    The Government owed Rs. 4,500 crore as subsidy to the KSEB. The Government departments and private parties owed Rs. 1,400 crore, he added.

    Power theft

    He said stern action was being taken against those who indulged in power theft. The anti-power-theft squad collected Rs. 7.5 crore during the past five months. The Electrical Inspectorate had been asked to conduct an inquiry into the death of two linemen from short-circuits, he said.

    Printer friendly page  
    Send this article to Friends by E-Mail



    Kerala

    News: ePaper | Front Page | National | Tamil Nadu | Andhra Pradesh | Karnataka | Kerala | New Delhi | Other States | International | Opinion | Business | Sport | Miscellaneous | Engagements |
    Advts:
    Classifieds | Jobs | Obituary | Updates: Breaking News |



  • News Update


    The Hindu Group: Home | About Us | Copyright | Archives | Contacts | Subscription
    Group Sites: The Hindu | The Hindu ePaper | Business Line | Business Line ePaper | Sportstar | Frontline | Publications | eBooks | Images | Home |

    Copyright © 2006, The Hindu. Republication or redissemination of the contents of this screen are expressly prohibited without the written consent of The Hindu