![]() Online edition of India's National Newspaper Thursday, Jun 05, 2008 ePaper | Mobile/PDA Version |
|
|
|
|
|
|
| Kerala |
![]() |
News:
ePaper |
Front Page |
National |
Tamil Nadu |
Andhra Pradesh |
Karnataka |
Kerala |
New Delhi |
Other States |
International |
Opinion |
Business |
Sport |
Miscellaneous |
Engagements |
Advts: Retail Plus | Classifieds | Jobs |
Kerala
Several entry points to the city suggested Urban master plan yet to be completed KOCHI: Town planning experts suggest that several entry points into a city area are a must for a bustling commercial place that is growing. However, Kochi city has grown over the last decade with only a few entry points into the main commercial area. The North and South overbridges were the only two entry points though Thevara became another one because of the Kundanoor bridges. But, the traffic mostly travel across the first two bridges. Development of a few parallel roads to the North-South corridor and the East-West corridors will decongest the arterial roads of the city considerably, said a town planner. Thammanam-Pulleppady Road is one such that was started with a big fanfare. However, this very important infrastructure remains unfinished as the rail overbridge is not completed. The road would decongest a lot of traffic from Banerjee Road and M.G. Road as it would be an exit and entry point from the Kakkanad side. In fact, the Master Plan by the Town Planning department calls it the CBD-IT city road. Likewise, there are other roads like Karshaka Road, Chilavanoor Bund Road, Salim Rajan Road and Kaloor-Kadavanthara-Pottekuzhi Road which when developed, will take away a major chunk of traffic from the main arterial roads like the Sahodaran Ayyappan Road, Chittoor Road and M.G. Road. The Greater Cochin Development Authority had quite some time ago, developed detailed project reports for at least 16 corridors in the city. Similarly, roads leading to suburban areas such as Thripunithura are most congested with peak time traffic spilling over. People’s voices have been raised to develop the Kaniyampuzha Road from Vytilla to Eroor, Thripunithura, which would provide a parallel connectivity to the main town of Thripunithura as well. A bridge from Maradu to Thripunithura, running parallel to the iron bridge and the Petta bridge would take traffic coming from Alappuzha side to Vaikom without touching Thripunithura town. However, the route of the road continues to be disputed. Infrastructure development is basically the government’s job and land acquisition for the same needs to be done much earlier so that there are few hurdles when a project is launched, said a town planning expert. But, as the Master Plan continues to be made over several years, the local bodies do not have a document to fall back upon.
Printer friendly
page
News:
ePaper |
Front Page |
National |
Tamil Nadu |
Andhra Pradesh |
Karnataka |
Kerala |
New Delhi |
Other States |
International |
Opinion |
Business |
Sport |
Miscellaneous |
Engagements |
|
|
|
The Hindu Group: Home | About Us | Copyright | Archives | Contacts | Subscription Group Sites: The Hindu | The Hindu ePaper | Business Line | Business Line ePaper | Sportstar | Frontline | Publications | eBooks | Images | Home |
Copyright © 2008, The
Hindu. Republication or redissemination of the contents of
this screen are expressly prohibited without the written consent of
The Hindu
|